PE waterproof material construction process and scheme, water tank construction
PE waterproof material construction process and scheme, water tank construction 1. Construction process Clean the base layer → prepare adhesive → handle complex parts → additional layer → construction waterproof layer → waterproof layer inspection → waterproof protective layer 2. Construction operation requirements of YH-PE polymer composite waterproof membrane: (1) The base layer (leveling